Pushkar’s
temple tree

Enquire Now

Download Brochure

Project Details

Project Type

Premium Residential Apartments

Area

5559 Sq. Ft.

Location

Plot No.48, Old Door No.7, New Door No.17, 3rd Main Road, Kasturba Nagar, Adyar, Chennai - 600020

Accomodation

3 BHK

Total No. of Units

10 Units

No. of Floors

Stilt + 5 Floors

Project Availability

Only 1 Flat Available

Parking

1 Reserved Car Park For Each Flat

Unit Flat Area Status Facing
First Floor
1-A 1470 sq. ft. Sold North
1-B 1555 sq. ft. Sold West
Second Floor
2-A 1470 sq. ft. Sold North
2-B 1555 sq. ft. Sold West
Third Floor
3-A 1470 sq. ft. Sold North
3-B 1555 sq. ft. Sold West
Fourth Floor
4-A 1470 sq. ft. Sold North
4-B 1555 sq. ft. Sold West
Fifth Floor
5-A 1470 sq. ft. Sold North
5-B 1555 sq. ft. Available West

Have more questions on your mind? Get in touch with our team to get more details.

Have more questions on your mind? Get in touch with our team to get more details.

Project Specifications

Pre Foundation

Geotechnical Investigation (Soil Test)

  • Conducting Soil Investigation to determine the STP - Value for the proposed construction.
  • Derivation of a Soil Test Report with suitable recommendations for the foundation based on the soil investigation.
Ground Water Investigation (Bore Well)
  • Divining the bore well using scientific methodology and executing the same
  • Water Test Analysis to determine the TDS (Total Dissolvable Solids).
  • Derivations of a report to understand the TDS values (Total Dissolved Solids) and to determine the LPH discharge (Liters per hour).

Foundation

  • Earthquake resistant R.C.C. framed structure with suitable foundations based on the geotechnical investigation report. In compliance with IS 1893 - 2016, IS 456 - 2005.
  • Anti-Termite treatment in compliance with IS 6313 – 2001
  • Basement height (From existing road level to car park flooring level) shall be 2’6” feet.
  • Basement filling with filling soil, topped and consolidated with 6” inches of M. Sand and 6” inches of P.C.C with a mix ratio of 1:4:8.

Super Structure

  • R.C.C. framed structure with RCC columns, beams and slabs.
  • Walls using Wire Cut Bricks / Aerocon Blocks.

Doors And Windows

  • Main entrance door – Teak wood frame & shutters with natural walnut veneered solid panel shutter.
  • Internal doors – Steam beach wood frame with laminate finish.
  • Toilet door – Tubular core shutter.
  • Windows shall be black powder coated aluminum from YKK/SCHUCO.
  • MS grills in all windows.
  • Locks from YALE / DORSET.

Painting & Finishing

  • Internal walls and ceiling shall be finished with 2 coats of BIRLA wall care putty. One coat of ICI primer. Two coats of premium emulsion from ICI DULUX.
  • M.S. Grills shall be painted with one coat of zinc chromate primer and finished with two coats of synthetic enamel paint from ICI.
  • External walls shall have one coat of cement-based textured finish. One coat of exterior primer from ICI and two coats of weather shield max from ICI.

Plumbing & Sanitary

Inner Plumbing:

  • Bathroom and kitchen water lines with FINOLEX CPVC pipes.
  • Overhead tanks to the bathroom and kitchen water lines with FINOLEX UPVC pipes
Outer Plumbing:
  • Outer waste line, soiline, rainwater harvesting lines shall be with 4” inch and 6” inch dia of 4 kg / SQ.CM pressure with necessary specials of FINOLEX PVC pipes.
Sanitary & CP Fittings:
  • All toilets shall have concealed wall hung closets with soft closing seat covers from JAQUAR / KOHLER.
  • Health Faucet from JAQUAR / KOHLER.
  • All toilets shall have a white wash basin with necessary fittings from JAQUAR / KOHLER.
  • All toilets shall have Opel prime series thermostatic shower mixer with 3-way diverters from JAQUAR / KOHLER.
  • Overhead shower and Arm from JAQUAR / KOHLER.
  • All toilets shall be provided with a shower enclosure.
  • Heat pump will be provided, eliminating the need for geysers in the bathrooms.

Electrical And Power Back Up

  • 3 phase electricity supply and independent meters.
  • FRLS wires from PANASONIC / HAVELS / LEGRAND.
  • Split A/C points for Living, Dining & all bedrooms.
  • Modular switches and sockets of PANASONIC / HAVELS / LEGRAND.
  • Earth leakage circuit breaker to prevent shock.
  • DG power back for the flats and common area excluding A/C.
  • TV, telephone points in living and master bedrooms.
  • 2-way switches for all bedrooms.
  • AC copper piping for all indoor to outdoor units will be provided within the scope of the promoter.

Flooring & Wall Tiles

  • Living, Dining and Kitchen shall have vitrified floor 4x2 of RAK/SOMANY/KAJARIA
  • Balcony and Utility area shall have anti skirt flooring
  • Bathrooms shall have First quality wall tiles glazed / matt from SOMANY / RAK / KAJARIA and flooring shall have matching first quality anti-skid tiles (rate of Rs. 100 per sq. ft.).
  • Bathroom flooring shall have 3mm spacer with matching epoxy grout.

Kitchen

  • Black Granite countertop with CARYSIL sink.
  • CP fittings from JAQUAR / KOHLER.
  • Provision for exhaust fan, refrigerator, and water purifier.
  • Adequate power points for all Kitchen appliances.
  • Ceramic / Printed tiles on the wall 2’ above the countertop.

Special Amenities

  • Landscaping for common areas.
  • Reserved car park for each flat.
  • Lobby with elegant seating on stilt floor.
  • CCTV surveillance camera with recording facility.
  • Automatic lift with V3FF ARD from JOHNSON / OTIS ELEVATORS with glass door access till terrace
  • Generator from KIRLOSKAR GREEN with adequate capacity.
  • Rainwater harvesting.
  • Sump and overhead tank for metro water & borewell.
  • A common servant toilet shall be provided.
  • One borewell for supplement usage.
  • SATWAVE - Integrated Dish TV system for the entire project.
  • Terrace waterproofed with a layer of pressed Kerala Tiles/ Thermatek tiles.
  • Staircase with SS handrails from S-Rail.
  • Pest Control measures in all stages by PCI.
  • Headroom, Lift room doors from HORMANN SHAKTI steel doors.
  • False ceiling will be provided in all the apartments.

Have more questions on your mind? Get in touch with our team to get more details.

Near By Landmarks

  • Fortis Malar Hospital - 1200 Meters
  • IIT Madras - 1500 Meters
  • Anna University - 2200 Meters
  • Sishya School - 1000 Meters
  • Banks & ATM - 200 Meters
  • Restaurants & Shopping - 200 Meters

Have more questions on your mind? Get in touch with our team to get more details.

Stage of Work Payment Percentage Installment No.
Initial Payment ( EB + CMWSSB +Car Park Charges incl.) : 15% I
On Completion of Foundation : 10% II
On Completion of Ground / Stilt Floor Roof Slab : 10% III
On Completion of First Floor Roof Slab : 10% IV
On Completion of Second Floor Roof Slab : 10% V
On Completion of Third Floor Roof Slab : 10% VI
On Completion of Fourth Floor Roof Slab : 10% VII
On Completion of Fifth Floor Roof Slab : 10% VIII
On Completion of Brickwork in respective Flats : 10% IX
On Handing over : 05% X

Have more questions on your mind? Get in touch with our team to get more details.

Pushkar’s Temple Tree

Plot No.48, Old Door No.7, New Door No.17, 3rd Main Road, Kasturba Nagar, Adyar, Chennai - 600020

10 Units | Stilt + 5 Floors

Enquire Now Find Directions

Project Status Pictures

Enquire Now
Call Now