Pushkar’s
bloomingdale

Enquire Now

Download Brochure

Project Details

Project Type

Premium Residential Apartments

Area

10200 Sq. Ft.

Location

Old Door No.72/1, New Door No. 96/1, McNichols Road, Chetpet, Chennai – 600 031

Accomodation

3 BHK

Total No. of Units

15 Units

No. of Floors

Stilt + 5 Floors

Project Availability

Available

Parking

1 Reserved Car Park For Each Flat

Unit Flat Area Status Facing
First Floor
1-A 2570 sq. ft. Sold East
1-B 1809 sq. ft. Available North
1-C 1809 sq. ft. Available North
Second Floor
2-A 2570 sq. ft. Sold East
2-B 1809 sq. ft. Available North
2-C 1809 sq. ft. Sold North
Third Floor
3-A 2570 sq. ft. Sold East
3-B 1809 sq. ft. Sold North
3-C 1809 sq. ft. Sold North
Fourth Floor
4-A 2570 sq. ft. Sold East
4-B 1809 sq. ft. Available North
4-C 1809 sq. ft. Sold North
Fifth Floor
5-A 2570 sq. ft. Sold East
5-B 1809 sq. ft. Sold North
5-C 1809 sq. ft. Sold North

Have more questions on your mind? Get in touch with our team to get more details.

Have more questions on your mind? Get in touch with our team to get more details.

Project Specifications

Pre Foundation

Geotechnical Investigation (Soil Test)

  • Conducting Soil Investigation to determine the STP - Value for the proposed construction.
  • Derivation of a Soil Test Report with suitable recommendations for the foundation based on the soil investigation.
Ground Water Investigation (Bore Well)
  • Divining the bore well using scientific methodology and executing the same
  • Water Test Analysis to determine the TDS (Total Dissolvable Solids).
  • Derivations of a report to understand the TDS values (Total Dissolved Solids) and to determine the LPH discharge (Liters per hour).

Foundation

  • Earthquake resistant R.C.C. framed structure with suitable foundations based on the geotechnical investigation report. In compliance with IS 1893 - 2016, IS 456 - 2005.
  • Anti-Termite treatment in compliance with IS 6313 – 2001
  • Basement height (From existing road level to car park flooring level) shall be 2’6” feet.
  • Basement filling with filling soil, topped and consolidated with 6” inches of M. Sand and 6” inches of P.C.C with a mix ratio of 1:4:8.

Super Structure

  • R.C.C. framed structure with RCC columns, beams and slabs.
  • Walls using Wire Cut Bricks / Aerocon Blocks.

Doors And Windows

  • Main entrance door of size 8’x4’ – Teak Wood Frame & 43mm Shutters with natural walnut veneered solid panel shutter.
  • Internal Doors – 36mm Tubular Core Shutter with laminate finish.
  • Toilet Doors – 36mm Tubular Core Shutter with laminate finish.
  • Aluminum Openable Windows from YKK ALUMINIUM.
  • MS grills in all windows.
  • Locks from DORSET.

Painting & Finishing

  • Internal walls and ceiling shall be finished with 2 coats of BIRLA wall care putty. One coat of ICI primer. Two coats of premium emulsion from ICI DULUX.
  • M.S. Grills shall be painted with one coat of zinc chromate primer and finished with two coats of synthetic enamel paint from ICI.
  • External walls shall have one coat of cement-based textured finish. One coat of exterior primer from ICI and two coats of weather shield max from ICI.

Plumbing & Sanitary

Inner Plumbing:

  • Bathroom and kitchen water lines with FINOLEX CPVC pipes.
  • Overhead tanks to the bathroom and kitchen water lines with FINOLEX UPVC pipes
Outer Plumbing:
  • Outer waste line, soiline, rainwater harvesting lines shall be with 4” inch and 6” inch dia of 4 kg / SQ.CM pressure with necessary specials of FINOLEX PVC pipes.
Sanitary & CP Fittings:
  • All toilets shall have concealed wall hung closets with soft closing seat covers from JAQUAR / KOHLER.
  • Health Faucet from KOHLER.
  • All toilets shall have a white wash basin with necessary fittings from KOHLER.
  • All toilets shall have Opel prime series thermostatic shower mixer with 3-way diverters from KOHLER.
  • Overhead shower and Arm from KOHLER.
  • Toilets shall be provided with glass shower enclosures from KOHLER wherever feasible.

Electrical And Power Back Up

  • 3 phase electricity supply and independent meters.
  • FRLS wires from PANASONIC / LEGRAND / SCHNEIDER.
  • Split A/C points for Living, Dining & all bedrooms.
  • Modular switches and sockets of PANASONIC / LEGRAND / SCHNEIDER.
  • Earth leakage circuit breaker to prevent shock.
  • DG power back for the flats and common area excluding A/C.
  • TV, telephone points in living and master bedrooms.
  • 2-way switches for all bedrooms.

Flooring & Wall Tiles

  • Living & Dining Italian Marble Flooring.
  • All Bedrooms & Kitchen shall have first quality vitrified tile (4x2) from SOMANY / RAK / KAJARIA .
  • Tiles in Living, Dining and Bedroom will be laid with 3mm spacer with Bal Endura/ Laticrete grout
  • Bathrooms shall have First quality wall tiles of (2x1) glazed / matt from SOMANY / RAK / KAJARIA and flooring shall have matching first quality anti-skid tiles (rate of Rs. 100 per sq. ft.).
  • Bathroom flooring shall have 3mm spacer with matching epoxy grout.

Kitchen

  • Black Granite countertop with CARYSIL sink.
  • CP fittings from KOHLER.
  • Provision for exhaust fan, refrigerator, and water purifier.
  • Adequate power points for all Kitchen appliances.
  • Ceramic / Printed tiles on the wall 2’ above the countertop.

Special Amenities

  • Landscaping for common areas.
  • Reserved car park for each flat.
  • Lobby with elegant seating on stilt floor.
  • CCTV surveillance camera with recording facility.
  • Automatic lift with V3FF & ARD from MITSUBHISHI / TOSHIBA ELEVATORS access till terrace
  • Generator from KIRLOSKAR GREEN with adequate capacity.
  • Rainwater harvesting.
  • Sump and overhead tank for metro water & borewell.
  • A common servant toilet shall be provided.
  • One borewell for suppliment usage.
  • SATWAVE - Integrated Dish TV system for the entire project.
  • Terrace waterproofed with a layer of pressed Kerala Tiles/ Thermatek tiles.
  • Staircase with MS powder coated handrails with wooden top finish.
  • Pest Control measures in all stages by PCI.
  • Headroom, Liftroom doors from HORMANN SHAKTI steel doors.
  • Centralized heat pump for all flats.

Have more questions on your mind? Get in touch with our team to get more details.

Near By Landmarks

  • Our Lady’s School - 150 Meters
  • Maharishi Vidya Mandir School - 550 Meters
  • Apollo First Med Hospitals - 850 Meters
  • Dr. Mehta’s Hospital - 950 Meters
  • Kilpauk Metro - 450 Meters
  • Chetpet Eco Park - 300 Meters
  • Bank/ATM - 200 Meters
  • Shopping & Restaurants - 200 Meters.

Have more questions on your mind? Get in touch with our team to get more details.

Stage of Work Payment Percentage Installment No.
Initial Payment ( EB + CMWSSB +Car Park Charges incl.) : 15% I
On Completion of Foundation : 10% II
On Completion of Ground / Stilt Floor Roof Slab : 10% III
On Completion of First Floor Roof Slab : 10% IV
On Completion of Second Floor Roof Slab : 10% V
On Completion of Third Floor Roof Slab : 10% VI
On Completion of Fourth Floor Roof Slab : 10% VII
On Completion of Fifth Floor Roof Slab : 10% VIII
On Completion of Brickwork in respective Flats : 10% IX
On Handing over : 05% X

Have more questions on your mind? Get in touch with our team to get more details.

Pushkar’s Bloomingdale

Old Door No.72/1, New Door No. 96/1, McNichols Road, Chetpet, Chennai – 600 031

15 Units | Stilt + 5 Floors

Enquire Now Find Directions

Enquire Now
Call Now